Installation & Care Guide
Indrik mandala art is designed for different interior applications, including walls, ceilings, pooja rooms, cafes, offices, receptions, clocks and table tops.
The installation method may vary depending on the selected design, product size, number of layers, product weight, placement area and surface condition. Please review the installation requirements before fixing the product.
Indrik provides installation guidance only. Physical installation service is not included.
INSTALLATION GUIDANCE
Before Installation
Before installing your Indrik mandala art:
• Check the product and packaging carefully after delivery.
• Confirm that the design, size and colors match the approved order.
• Select the exact placement area before beginning installation.
• Measure and mark the center point and outer boundaries.
• Make sure the wall, ceiling or surface is dry, clean and structurally suitable.
• Keep the product on a clean, flat surface until installation.
• Do not place heavy items over the product.
• Do not begin installation if the product appears damaged.
For large, layered or ceiling products, we strongly recommend using an experienced professional installer.
Wall Art Installation
The correct fixing method depends on the product size, weight, number of layers and wall condition.
Before installation:
• Measure the wall width and height.
• Mark the center of the wall and product.
• Check the alignment from a distance before final fixing.
• Make sure the wall surface is clean, dry and even.
• Confirm that the selected fixing method can safely support the product.
Depending on the product and placement area, installation may require suitable hooks, screws, wall plugs, mounting hardware or another approved fixing method.
Do not rely on ordinary tape or an unsuitable adhesive for large or heavy products.
Before drilling, confirm that there are no concealed electrical wires, plumbing lines or other services behind the selected location.
For large statement pieces, installations above furniture or installations at height, use a professional installer.
Ceiling Panel Installation
Ceiling mandala panels require careful planning and professional handling.
Before installation, confirm:
• Ceiling length and width
• Final panel dimensions
• Panel weight and number of layers
• Ceiling structure and condition
• Position of lights, fans and chandeliers
• Electrical wiring and connection points
• Required center alignment
• Access for future electrical maintenance
Ceiling products should be installed only by an experienced professional familiar with ceiling fixtures and interior installations.
If the design is placed around a chandelier, fan, light or electrical fitting, coordinate the installation with a qualified electrician or appropriate professional.
The product must be supported using a fixing method suitable for its weight, size and ceiling type.
Do not install a ceiling panel using only ordinary decorative tape or an unverified adhesive.
Indrik can provide placement and installation guidance based on the selected product. Final installation, structural assessment and electrical work remain the customer’s responsibility.
Pooja Room Installation
Before installing a pooja-room panel:
• Measure the available area behind or around the mandir.
• Confirm the position of the mandir before fixing the product.
• Keep important central design elements visible.
• Check the location of lights, electrical points and shelves.
• Maintain suitable distance from open flames, diyas, incense and excessive heat.
• Ensure that the surface is clean, dry and stable.
For larger pooja-room installations, use an experienced installer to maintain alignment and protect the design.
Cafe, Restaurant, Office and Reception Installation
Commercial installations may involve larger panels, logos, multiple sections or high placement areas.
Before installation:
• Confirm the final wall dimensions.
• Mark the position of the reception desk, furniture or business logo.
• Check visibility from the entrance and customer areas.
• Plan adequate lighting around the design.
• Use professional installation for large or multi-panel products.
• Avoid blocking emergency signs, electrical panels or access points.
Where a business name or logo forms part of the approved design, confirm the spelling, position and proportions before production and installation.
Mandala Clock Installation
Before installing a mandala clock:
• Select a wall that provides clear visibility.
• Confirm that the fixing method can support the complete clock.
• Keep the clock level and properly centered.
• Ensure that the clock hands can move freely.
• Do not press, bend or obstruct the clock hands.
• Insert or replace the battery carefully.
• Keep the clock away from direct water and excessive moisture.
After installation, observe the clock for a few minutes to confirm that its hands are moving freely and not touching one another.
Mandala Table Top Placement
Before placing a mandala table top:
• Confirm the table length, width, diameter or shape.
• Make sure the base table is level and stable.
• Clean the surface before placement.
• Lift the table top carefully instead of dragging it.
• Use adequate support across the complete table base.
• Avoid unsupported overhang unless it has been approved for the design.
• Use protective pads where required.
• Do not place excessive weight on one unsupported area.
For dining tables, center tables, conference tables and large custom surfaces, confirm the base structure before installation or placement.
Multi-Panel and Layered Designs
Some designs may contain multiple sections or several layers.
Before fixing a multi-panel design:
• Lay all sections on a clean floor or protected surface.
• Confirm the correct order and orientation.
• Maintain equal spacing between panels.
• Mark every panel position before drilling or fixing.
• Check the complete arrangement from a distance.
• Begin final installation only after approving the alignment.
Do not lift large layered products from only one decorative edge. Support the product evenly while moving it.
CARE AND MAINTENANCE
Regular Cleaning
For routine cleaning:
• Use a clean, soft and dry cloth.
• Remove dust gently without applying excessive pressure.
• Use a soft brush for detailed or layered areas.
• Support the product carefully while cleaning large designs.
• Clean the product regularly to prevent dust buildup.
Avoid using:
• Wet cloths
• Excessive water
• Harsh chemicals
• Abrasive cleaners
• Rough brushes
• Strong solvents
• Direct high-pressure air or water
Water and Moisture Protection
Keep the product away from:
• Direct water exposure
• Damp walls
• Water leakage
• Excessive humidity
• Unprotected outdoor areas
• Areas where water may collect
Before installation, make sure the wall, ceiling or table surface is dry and free from leakage.
If the placement area develops dampness or leakage later, remove or protect the product and repair the source of moisture.
Heat and Flame Protection
Keep mandala art away from:
• Open flames
• Diyas placed too close to the product
• Gas stoves
• High-heat appliances
• Direct heat sources
• Areas with excessive heat buildup
For pooja-room products, maintain a safe distance from lamps, incense and other heat sources.
Sunlight and Color Care
Long-term exposure to strong direct sunlight may affect the appearance of interior décor over time.
For better protection:
• Avoid placing the product in continuous harsh sunlight where possible.
• Use curtains or blinds in strongly exposed areas.
• Keep the product intended for indoor use in a protected interior location.
Handling and Moving
When moving the product:
• Use clean and dry hands.
• Support it from multiple points.
• Do not lift it using only a decorative edge.
• Do not drag it across the floor or furniture.
• Protect the front surface and corners.
• Keep layered sections supported during transport.
For large products, two or more people may be required for safe handling.
Storage Before Installation
If the product will not be installed immediately:
• Keep it in a clean, dry indoor area.
• Store it flat or according to the packing instructions.
• Do not place heavy items over it.
• Keep it away from water and moisture.
• Protect the corners and front surface.
• Do not remove protective packaging unnecessarily.
Installation Responsibility
Indrik provides product-specific installation guidance where required.
Physical installation, site preparation, structural assessment, drilling, electrical work and selection of final mounting hardware are not included unless separately confirmed in writing.
The customer is responsible for:
• Providing correct measurements
• Selecting a suitable placement area
• Arranging an appropriate installer
• Checking wall or ceiling conditions
• Confirming concealed wiring or plumbing locations
• Ensuring safe and secure installation
• Following the product-specific guidance provided by Indrik
Damage caused by improper installation, unsuitable hardware, dampness, water exposure, electrical work or incorrect handling is not considered a manufacturing defect.
Need Installation Guidance?
Before installation, you can share:
• Product name or design code
• Product size
• Number of layers, if known
• Wall, ceiling or table photograph
• Placement-area measurements
• City and PIN code
• Installer’s question, if any
WhatsApp: +91 74153 32202
Email: indrikdecor@gmail.com
Support Hours: 11:00 AM–7:00 PM
Indrik
Crafted With Imagination